Nightclub Strip Out
SECTOR: Family Entertainment Venue / Trampoline Park / Cafe
PROJECT SCALE: Complex / Specialist Project, £1m+ | Programme-led
SCOPE OF WORKS: Pre-Construction Strip Out & Enabling works | Structural & Builders Works | M&E | Walls, Ceilings & Finishes | Flooring Works | Joinery & Bespoke Elements | Specialist Leisure Integration | Kitchen & Back-of-House| Compliance Testing & Commissioning | Final Works & Handover
SAFETY-LED: CDM Controlled Works, Zero H&S incidents
01. The Challenge
02. The Solution
A phased, methodical strip-out and structural works strategy was implemented to ensure safety, compliance, and programme certainty.
Key elements of the solution included:
Detailed pre-planning of structural removals and floor infill works
Careful sequencing of strip-out activities to protect the base building
Temporary works and protection measures to maintain safety at all times
Precise execution of structural floor infills and new floor extensions to create the required load-bearing platform for the new use
Regular communication with the landlord and landlord’s agent was maintained throughout the project, ensuring transparency, approvals, and coordination at every stage.
Health & safety was treated as a non-negotiable priority, with:
Clear segregation of works
Strict site controls
Zero incidents or near misses recorded during delivery
SOFO delivered the fit out of the Trampoline Park at Xscape Milton Keynes with a high level of professionalism. Their coordination of trades and ability to work within a busy leisure environment ensured the project was completed safely, efficiently and to a high standard.- CLIENT PROJECT MANAGER
03. The Result
The project successfully transformed the space from a fully operational nightclub into a structurally prepared shell, ready for the fit-out of a trampoline and activity theme park within the centre.
The result delivered:
A fully stripped and reconfigured unit
New and modified structural floor areas built to suit the new attraction
A safe, compliant, and landlord-approved environment
Zero health & safety issues throughout the works
A strong working relationship with the landlord and managing agent
This project demonstrates the ability to deliver complex structural strip-outs within live leisure environments, while maintaining safety, programme control, and stakeholder confidence.